Hunan Shouchuang Road&Bridge Equipment Machinery Co.,Ltd.
home>Products and Services > Bailey Bridge

CB321 Bailey Bridge for Africa Hydropower Project


Quick Details

Standard:AISI, ASTM, BS, DIN, GB, JIS              

Grade:Q345B-Q460C

Place of Origin:China                                 

Brand Name: SHOUCHUANG

Model Number: CB100/CB321                           

Application: Steel Structure Bridge

Color: Army Green or Silver Grey                         

Surface treatment: Hot Dip Galvanised

Supply Ability:10000 Tons/Year                       

Packaging & Delivery: Nude packing and loading into 40' HQ


Overview:


Type:

321(CM100 Type) Bailey bridge


Product Introduction:

     “321”steel bridge is a kind of rapid assembly bridge produced and researched based on the original British bailey truss bridge and combinated with China's national condiditions.


Product  Properties:

   "321" Bailey bridge feaures simple structure, convenient transportation, fast erection, large load, good interchangeability and strong adaptability


Product  Application:

  It is the most widely used aseembled bridge,it be used in  national defense, transportation engineering, municipal water conservancy projects.



Specifications:

Product  Specification:

     *The bridge deck has a net width of 4M
     *The maximum net width of 7M. 
     *The combined span is 9-69m


Geometric characteristic table of 321 type steel bridge


Features:


FAQ (Frequently Asked Question)


1, Q: Are you a factory or a trade company?
We are the professional manufacturer for bailey type bridge more 
than 40 years and the annual output is about 10000T/YEAR.

2, Q: What can you offer?
We can supply all kinds of bailey bridge and bailey truss for special applications, we also can provide old and new bailey bridge inspection and maintenance service.

3, What is your competitiveness ?
*  Competitive price:We are the manufacture who has the open mind for the deep cooperation,we willing to share our profit with the strong agent in oversea market.
*  High quality guarantee: We have strong technical support. Our company cooperated and established R&D team with GUANGZHOU MILITARY REGION ENGINEERING SCIENTIFIC R&D INSTITUTE and BRIDGE ENGINEERING DEPARTMENT OF TONGJI UNIVERSITY. Those team members are the authority doctoral advisor, professional engineer and master degree candidate.
The factory adopted the welding robot to ensure the high lever welding quality.
*  Good after-service : Each bridge shall be installed in our workshop for testing before shipment.
We can supply the professional team to your local site to do the installation guide.
Our after–service team can provide the bridge inspection for you.

4, Q: Did your company exported before?
Our company's predecessor is the state-owned factory-- Chenzhou Road Engineering Machinery Factory,this factory is the oldest manufacture for the bailey bridge in China and had exported about 300 sets of bridge to the Southeast Asia. 

5, Q: How about the delivery time?
About 3-5 weeks after receiving the deposit and loading in 40ft HQ.


Did not find relevant case column!

Any questions for technology or equipment,please contact us