Hunan Shouchuang Road&Bridge Equipment Machinery Co.,Ltd.
home>Products and Services > Construction Bridge

Bailey Bridge Girder Erecting Machine


Quick Details

Standard:AISI, ASTM, BS, DIN, GB, JIS              

Grade:Q345B-Q460C

Place of Origin:China                                 

Brand Name: SHOUCHUANG

Model Number: CB100/CB321                           

Application: Steel Structure Bridge

Color: Army Green or Silver Grey                         

Surface treatment: Hot Dip Galvanised

Supply Ability10000 Tons/Year                       

Packaging & Delivery: Nude packing and loading into 40' HQ



Overview:

Product Introduction:

A bridge erector is a device for placing prefabricated beams onto prefabricated piers.According to the structure of weighing beam, it has bailey assembly type and steel girder truss type.


Product  Properties:

1. Bailey-type bridge erecting machine has strong applicability, good interchangeability, convenient transportation, wide application and economic saving
2. Steel girder truss bridge erecting machine has good stability, small deflection deformation, large span and light weight
3. Hybrid bridge erecting machine has the related characteristics of the above two kinds of bridge erecting machines



Specifications:

The Specification:






Features:


FAQ (Frequently Asked Question)


1, Q: Are you a factory or a trade company?
We are the professional manufacturer for bailey type bridge more 
than 40 years and the annual output is about 10000T/YEAR.

2, Q: What can you offer?
We can supply all kinds of bailey bridge and bailey truss for special applications, we also can provide old and new bailey bridge inspection and maintenance service.

3, What is your competitiveness ?
*  Competitive price:We are the manufacture who has the open mind for the deep cooperation,we willing to share our profit with the strong agent in oversea market.
*  High quality guarantee: We have strong technical support. Our company cooperated and established R&D team with GUANGZHOU MILITARY REGION ENGINEERING SCIENTIFIC R&D INSTITUTE and BRIDGE ENGINEERING DEPARTMENT OF TONGJI UNIVERSITY. Those team members are the authority doctoral advisor, professional engineer and master degree candidate.
The factory adopted the welding robot to ensure the high lever welding quality.
*  Good after-service : Each bridge shall be installed in our workshop for testing before shipment.
We can supply the professional team to your local site to do the installation guide.
Our after–service team can provide the bridge inspection for you.

4, Q: Did your company exported before?
Our company's predecessor is the state-owned factory-- Chenzhou Road Engineering Machinery Factory,this factory is the oldest manufacture for the bailey bridge in China and had exported about 300 sets of bridge to the Southeast Asia. 

5, Q: How about the delivery time?
About 3-5 weeks after receiving the deposit and loading in 40ft HQ.



Did not find relevant case column!

Any questions for technology or equipment,please contact us