Quick Details
Standard:AISI, ASTM, BS, DIN, GB, JIS
Grade:Q345B-Q460C
Place of Origin:China
Brand Name: SHOUCHUANG
Model Number: CB100/CB321
Application: Steel Structure Bridge
Color: Army Green or Silver Grey
Surface treatment: Hot Dip Galvanised
Supply Ability:10000 Tons/Year
Packaging & Delivery: Nude packing and loading into 40' HQ
Product Introduction
The HD200 prefabricated highway steel bridge increased the height of the truss, strong the bearing capacity, it is more stability, and long use life.“321”steel bridge is a kind of rapid assembly bridge produced and researched based on the original British bailey truss bridge and combinated with China's national conditions.
Product Properties
It compared with the type 321, in the same combination, the strength increased by 33%, and the stiffness increased by 2.3 times.
Product Application
It is the most widely used high speed way.
Product Specification
*Single-lane bridge deck has a net width of 4.2m
*combined span of 9.14 -- 76.2m.
*double-lane bridge deck has a net width of 7.4m
*combined span of 9.14 -- 57.9m
FAQ (Frequently Asked Question)
1, Q: Are you a factory or a trade company?
We are the professional manufacturer for bailey type bridge more
than 40 years and the annual output is about 10000T/YEAR.
2, Q: What can you offer?
We can supply all kinds of bailey bridge and bailey truss for special applications, we also can provide old and new bailey bridge inspection and maintenance service.
3, What is your competitiveness ?
* Competitive price:We are the manufacture who has the open mind for the deep cooperation,we willing to share our profit with the strong agent in oversea market.
* High quality guarantee: We have strong technical support. Our company cooperated and established R&D team with GUANGZHOU MILITARY REGION ENGINEERING SCIENTIFIC R&D INSTITUTE and BRIDGE ENGINEERING DEPARTMENT OF TONGJI UNIVERSITY. Those team members are the authority doctoral advisor, professional engineer and master degree candidate.
The factory adopted the welding robot to ensure the high lever welding quality.
* Good after-service : Each bridge shall be installed in our workshop for testing before shipment.
We can supply the professional team to your local site to do the installation guide.
Our after–service team can provide the bridge inspection for you.
4, Q: Did your company exported before?
Our company's predecessor is the state-owned factory-- Chenzhou Road Engineering Machinery Factory,this factory is the oldest manufacture for the bailey bridge in China and had exported about 300 sets of bridge to the Southeast Asia.
5, Q: How about the delivery time?
About 3-5 weeks after receiving the deposit and loading in 40ft HQ.
Skype:senny3205970
Email:info@scbaileybridge.com